This study began in summer 2022. The goal is to develop and evaluate four potential projects to reduce phosphorus loading and improve the water quality of Lotus Lake. Results of the study will be presented in a feasibility report and include preliminary design of four best management practices (BMPs).
The BMPs were orginally identified in the 2017 Purgatory Creek Watershed Use Attainability Analysis (UAA) and incorporated into the District's capital improvements program.
Feasibility study underway
Construction anticipated to begin in 2024
City of Chanhassen
Visit Website